The frame and roof trusses are now assembled at BRF Walla. At the moment, chipboard hatches are installed and then cardboard to get a tight building.


The frame and roof trusses are now assembled at BRF Walla. At the moment, chipboard hatches are installed and then cardboard to get a tight building.


Groundwork is in full swing and the slab is ready to be poured right after the turn of the year. All 10 apartments are sold with binding contracts.

